When on a page you would like to add to your quick links click the appropriate Add this page to My H&K Quick Links to the left of this icon.
Home  :  About Us  :  News  :  Contact Us  :  Job Opportunities
 
The H&K Group
Site Contracting & Demolition Construction Materials Landscape Materials Recycling & Clean Fill Facilities Recycling & Clean Fill Facilities

Skip Navigation Links

 2010 News - Site Contracting Excavating Crushed Stone Sand Gravel

News - Miniscalco Construction Congratulated by Philadelphia Mayor  Michael Nutter  on Biodiesel Tank Installation - Miniscalco Construction Congratulated by Philadelphia Mayor  Michael Nutter  on Biodiesel Tank Installation Site Contracting Excavating Services Crushed Stone Sand Gravel Road Highway Paving
View All News Stories by List
Year:  
Title:  
• MINISCALCO CONSTRUCTION CONGRATULATED BY PHILADELPHIA MAYOR MICHAEL NUTTER ON BIODIESEL TANK INSTALLATION
Thursday, May 28, 2009
miniscalco-construction-congratulated-by-philadelphia-mayor--michael-nutter--on-biodiesel-tank-installation.pdf
     
 

Philadelphia, PA May 27, 2009 – Philadelphia Mayor, Michael A. Nutter, opened a new biodiesel refueling station at the city’s 3033 South 63rd Street Fleet Management facility. Miniscalco Construction, L.L.C. (Miniscalco Construction) received a special mayoral invitation to the press event as the primary contractor/installer of this first of five biodiesel refueling stations that are proposed as part of the city’s "Greenworks Philadelphia" Plan. The new fueling station will provide some 240 city vehicles with cleaner burning blended B20 diesel fuel. City vehicles running on this bio fuel will produce 20% less hydrocarbons and result in a 10% reduction in lifecycle greenhouse gases.

The City of Philadelphia Office of Fleet Management contracted Miniscalco Construction to erect a 10,000 gallon above ground storage tank and fueling station at the site. Miniscalco Construction began work on the project in early March of 2009. Working directly with the city’s engineer, Pennoni Associates Inc., Miniscalco Construction had to initially stabilize the tank slab area. Given the unsuitable characteristics of the native soils within tank footprint area, a reinforced, oversized spread slab footing was placed atop stabilized backfill. Miniscalco Construction performed all construction, piping, mechanical, and electrical and concrete work required for tank installation. Work was completed on May 27, 2009 in time for the inaugural fueling of the first city fleet vehicle; Mayor Nutter personally dispensed biodiesel into a city fleet vehicle for the press event.
Miniscalco Construction provides full-service contracting and engineering services including both above and underground storage tank installations and removals, environmental remediation, utilities installation including heavy mechanical/industrial installations.

Miniscalco Construction has been a member of The H&K Group Family of Companies since 2006. For more information on the referenced biodiesel fueling station installation project, Miniscalco Construction, or The H&K Group, please phone 610-2322-4090 or visit http://www.hkgroup.com /.
Home | About Us | News | Contact Us | Site Search | Job Opportunities | FAQ | Site Map
Copyright © 2006-2010 The H&K Group | P.O. Box 196, 2052 Lucon Road, Skippack, PA 19474 | Phone: 610-584-8500

What is this?